Karen Assmann, Celine Heuze, and Axel Meiton getting ready to load the water sampling system onto the I/B Oden in June 2015.
55.855592
12.830694
Karen Assmann, Celine Heuze, and Axel Meiton getting ready to load the water sampling system onto the I/B Oden in June 2015.